Abdel-Fattah, A (2013) Dynamic site layout planning model, Unpublished PhD Thesis, , University of Calgary.

Chenger, D T (2012) Executive level capital project decision making: Rational or rationale?, Unpublished PhD Thesis, , University of Calgary (Canada).

Condon, E J (2006) The project game: Strategic estimating on major projects, Unpublished PhD Thesis, , University of Calgary (Canada).

Dehghan, R (2012) A new model, algorithm and computer tool to optimize overlapping of design activities in construction projects, Unpublished PhD Thesis, , University of Calgary.

Hewage, K N (2007) Construction productivity improvement by worker motivation and it based communication, Unpublished PhD Thesis, , University of Calgary (Canada).

Hossain, L (2010) An optimization model for the dynamic multi-project environment in construction, Unpublished PhD Thesis, , University of Calgary (Canada).

Lozon, J P (2008) Evaluating value improving practices for large scale projects, Unpublished PhD Thesis, , University of Calgary (Canada).

Marques, C P (2004) Selected issues in business and contractual relationships in private construction projects in Canada/China deals, Unpublished PhD Thesis, , University of Calgary.

Moussa, M A E-F M (2013) Unified simulation methodology and project risk assessment framework, Unpublished PhD Thesis, , University of Calgary (Canada).

Nada, D (2013) Project approval decisions: Exploring success factors, Unpublished PhD Thesis, , University of Calgary (Canada).

Seel, K C (2004) “Boom and bust” cycles in power plant construction: A simulation study of the temporal and geographical aspects of the Alberta competitive electrical industry, Unpublished PhD Thesis, , University of Calgary.

  • Type: Thesis
  • Keywords: market; conservation; feedback; payment; policy; simulation
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/305230442
  • Abstract:
    This dissertation describes a study undertaken to explore the potential for power plant construction to appear in the deregulated Alberta electrical system in waves of alternating under and over supply of electricity, or “boom and bust”. The ultimate impact to the market in such a case would be major swings in wholesale electricity prices as the industry transitions through the phases of a construction cycle. The study begins by exploring a geographical perspective on electricity and energy in general. It then provides a brief historical context on electrical deregulation in Alberta and elsewhere, before discussing the relevant literature pertaining to simulating dynamic feedback within energy systems with a focus on electricity. The work makes extensive use of Forrester's (1961) System Dynamics methodology to construct a simulation model called “APPCON” (for Alberta Power Plant Construction model). APPCON was used to demonstrate the conditions under which “boom and bust” construction cycles might occur using an explicit theory of investor behavior. Construction cycles are a potentially serious problem but they are not inevitable. The research concludes with computer simulations demonstrating how construction cycles could be dampened or eliminated through two different policy mitigation strategies; (1) continuous capacity payment along side of the market clearing price for energy, and, (2) a conservation strategy based on price sensitive load curtailment.

Siriwardana, C S A (2016) An integrated framework for worker planning and supervision in construction, Unpublished PhD Thesis, , University of Calgary (Canada).

Sodade, B A A (2011) Project management complexities in municipal projects, Unpublished PhD Thesis, , University of Calgary.

Tolani, O V (2013) An examination of risk perceptions and allocation preferences in public-private partnerships in Nigeria, Unpublished PhD Thesis, , University of Calgary (Canada).

Weerasinghe, U G D (2012) Development of a framework to assess sustainability of building projects, Unpublished PhD Thesis, , University of Calgary (Canada).

Weshah, N A (2015) Developing an interface management (IM) model for construction projects, Unpublished PhD Thesis, , University of Calgary (Canada).

Wickramaratne, S (2010) Design and analysis of tsunami warning and evacuation systems, Unpublished PhD Thesis, , University of Calgary (Canada).

Willoughby, K A (1999) Modelling assistance for project procurement and disposal decisions, Unpublished PhD Thesis, , University of Calgary (Canada).

Wimalasena, B A D S (2011) A planning tool for construction waste management, Unpublished PhD Thesis, , University of Calgary (Canada).

Zaghloul, R S (2005) Risk allocation in contracts: How to improve the process, Unpublished PhD Thesis, , University of Calgary.